DAIKIN
Daikin Industries Home Products Corporate Information Contact (General) Site Map
Search Help
Oil Hydraulics Products Sales Network Contact Us

Oil Hydraulics Div. Home > Super Unit > Case studies of energy-saving (Machining center)

Products

Super Unit

Case studies of energy-saving - Machining center

Case of company that manufactures automobile parts
Machine Machining center
Operating hour for one year 4320Hr
Cost per kWh 14 cent/kWh
Cost down by energy-saving effect for one year $1,241
moneyCost down by energy-saving effect for one year $1,241down
eco※1CO2 gas reduction for one year5t DOWNdown

※1 kWh×0.555(kg):The low of global warming control artcle3.1 in Japan

Power consumption of conventional hydraulic unit
Power consumption of Super Unit
Comparison of power consumption
Model Pressure Motor capacity Tank capacity
Before Conventional hydraulic unit Piston Pump 5.0MPa 3.7kW 200L
After Super Unit SUT10D60L21 5.0MPa Equivalent to 5.0kW 100L
money※1Cost down by energy-saving effect for one year $1,241down
eco※2CO2 gas reduction for one year5t DOWNdown

※1 This is a case study of energy-saving case in Japan.We assume that operating time is 4320hour for one year and15yen per kWh(1$=107yen)
※2 kWh×0.555(kg):The low of global warming control artcle3.1 in Japan

Page Top


Daikin Industries Home Products Corporate Information Contact (General) Site Map
Terms of use